久亚洲一线产区二线产区三线产区,国产伦精品一区二区三区视频,一本久久a久久精品vr综合,最近2019年日本中文免费字幕

銷售咨詢熱線
15953126901
15153196527
行業(yè)動(dòng)態(tài) dongnews
企業(yè)案例 case

聯(lián)系我們

  • 聯(lián)系人:濟(jì)南燕翔鐵藝制品有限公司
  • 手機(jī):15953126901
  • 電話:15153196527
  • 郵箱:785385551@qq.com
  • 地址:濟(jì)南市天橋區(qū)歷山北路黃臺(tái)不銹鋼市場(chǎng)3區(qū)317

鐵藝護(hù)欄安裝工藝從七個(gè)方面做起來

來源:http://m.nbsdzs.com 日期:2023-05-30 發(fā)布人: 瀏覽次數(shù):10
1、施工條件
1. Construction conditions
1.鐵藝預(yù)埋件已完成并驗(yàn)收合格。
1. The iron embedded parts have been completed and accepted as qualified.
2.鐵藝護(hù)欄成品驗(yàn)收合格,符合設(shè)計(jì)要求。
2. The finished iron guardrail has passed the acceptance and meets the design requirements.
3.現(xiàn)場(chǎng)施工水電供應(yīng)充足。
3. Adequate water and electricity supply for on-site construction.
2、施工準(zhǔn)備
2. Construction preparation
1.工具準(zhǔn)備:電焊機(jī)、焊條、角磨機(jī)、刷子、鋼卷尺、切割機(jī)、水平尺。
1. Tool preparation: electric welding machine, welding rod, angle grinder, brush, steel tape measure, cutting machine, level ruler
2.材料準(zhǔn)備:符合設(shè)計(jì)要求的成品護(hù)欄、設(shè)計(jì)要求的油漆。
2. Material preparation: Finished guardrails that meet the design requirements, and paint that meets the design requirements.
3. Construction Technology of Jinan Iron Art Guardrail
基層處理:清理護(hù)欄表層垃圾、露出預(yù)埋件預(yù)埋位置。
Grassroots treatment: Clean the surface garbage of the guardrail and expose the embedded parts and positions.
定位標(biāo)高控制:根據(jù)設(shè)計(jì)要求將護(hù)欄安裝位置、標(biāo)高標(biāo)出并做好記號(hào)。
Positioning elevation control: Mark and mark the installation position and elevation of the guardrail according to the design requirements.
固定焊接:根據(jù)做好的位置、標(biāo)高記號(hào)進(jìn)行固定并焊接或用膨脹螺絲固定。
Fixed welding: Fix and weld according to the prepared position and elevation marks, or fix with expansion screws.
修整磨平:焊接好后需進(jìn)行檢查,將焊口打磨光滑并補(bǔ)平接口處小孔。
Dressing and smoothing: After welding, it is necessary to inspect, polish the welded junction smooth, and fill the small holes at the interface.
4、注意事項(xiàng)
4. Precautions
1.成品護(hù)欄應(yīng)符合設(shè)計(jì)要求,經(jīng)驗(yàn)收合格后才能進(jìn)場(chǎng)施工。
1. The finished guardrail should meet the design requirements and can only be mobilized for construction after passing the acceptance inspection.
2.焊接點(diǎn)有打磨無法處理平整的及接口處有小孔的,需用原子灰密實(shí)以防進(jìn)水后生銹。
2. If the welding points are polished and cannot be processed smoothly, and there are small holes at the interface, atomic ash should be used to compact them to prevent rusting after water ingress.
3.連接部位需打磨光滑,刷兩道防銹漆,經(jīng)驗(yàn)收后再做表面一致處理。
3. The connecting parts need to be polished smooth, coated with two coats of rust resistant paint, and then subjected to surface consistency treatment after acceptance.
濟(jì)南鐵藝護(hù)欄
4.焊接時(shí)應(yīng)滿焊,禁止點(diǎn)焊。
4. During welding, full welding should be carried out and spot welding is prohibited.
5.已安裝完成的護(hù)欄上不得涂抹砂漿及掛放雜物。
5. The installed guardrail shall not be coated with mortar or hung with debris.
5、濟(jì)南鐵藝護(hù)欄質(zhì)量要求
5. Jinan Iron Art Guardrail Quality Requirements
1.成品護(hù)欄規(guī)格、質(zhì)量、外形符合設(shè)計(jì)要求。
1. The specifications, quality, and appearance of the finished guardrail meet the design requirements.
2.安裝位置、標(biāo)高正確,滿足設(shè)計(jì)要求。
2. The installation position and elevation are correct and meet the design requirements.
3.與預(yù)埋件連接牢固,無松動(dòng)、斷裂現(xiàn)象。
3. Connect firmly to the embedded parts without looseness or breakage.
4.護(hù)欄高度、護(hù)欄間距符合設(shè)計(jì)要求。
4. The height and spacing of guardrails meet the design requirements.
5.焊口平滑、焊縫均勻,且需經(jīng)過防銹處理。
5. The welding seam is smooth, the weld seam is uniform, and needs to undergo rust prevention treatment.
6、驗(yàn)收標(biāo)準(zhǔn)
6. Acceptance criteria
1.護(hù)欄的尺寸、高度、間距、油漆顏色符合設(shè)計(jì)要求。
1. The size, height, spacing, and paint color of the guardrail meet the design requirements.
2.護(hù)欄直形部分橫平豎直、彎曲部分曲線順暢。
2. The straight part of the guardrail is horizontal and vertical, and the curved part is smooth.
3.焊口平滑、焊縫均勻,油漆品種、顏色與護(hù)欄一致。
3. The welding seam is smooth, the weld seam is uniform, and the paint type and color are consistent with the guardrail.
4.焊接牢固、無松動(dòng)。
4. The welding is firm and free from looseness.
7、后期養(yǎng)護(hù)維修
7. Post maintenance and repair
1.保持護(hù)欄清潔,遠(yuǎn)離酸堿或易腐蝕物品并經(jīng)常除塵。
1. Keep the guardrail clean, away from acids, alkalis, or corrosive substances, and regularly remove dust.
2.護(hù)欄除油一般可采用有機(jī)溶液沖洗等方法。
2. Generally, methods such as organic solution flushing can be used to remove oil from guardrails.
3.小面積除銹可用有機(jī)油清洗、抹擦。
3. Small areas of rust removal can be cleaned and wiped with engine oil.
4.護(hù)欄有松動(dòng)需重新焊接,焊接后需打磨、防銹刷漆處理。
4. If the guardrail is loose, it needs to be re welded. After welding, it needs to be polished, rustproof, and painted.
鐵藝護(hù)欄安裝工藝相關(guān)內(nèi)容就講解到這里了,希望對(duì)您有所幫助,更多事項(xiàng)就來我們網(wǎng)站http://m.nbsdzs.com咨詢!
That's all for the installation process of iron guardrails. I hope it can be helpful to you. For more information, please come to our website http://m.nbsdzs.com consulting service
亚洲A无码综合A国产AV中文| 最近中文国语字幕在线播放| 年轻18gay白嫩青少年| 蜜臀久久99精品久久久久久| 亚洲av无码专区国产不卡顿| 亚洲不卡中文字幕无码| 农村女妓女野外bbw| 我和子的与子乱视频| 男人狂桶女人高潮完整过程| 国产亚洲精品美女久久久久久| 播五月色五月开心五月网| 女人被狂躁到高潮视频免费网站| 久久久久国产精品| 国产+高潮+白浆| 张开双腿客人粗暴挺进h| 挺进寡妇妇紧窄湿润| 中文字幕人妻无码一区二区三区| 国产精品女同一区二区| 国产精品无码V在线观看| 小雪早被伴郎摸湿出水了| 辽宁少妇高潮45分钟| 麻豆传煤入口免费进入2023| 久久精品国产亚洲av麻豆色欲| 久久久久亚洲av无码专区| 国产强奷伦奷片| 无码a片观看免费| 表妺好紧竟然流水了在线观看| 性裸交a片a∨天传媒公司| 日产无人区一线二线三线HAV| 久久午夜无码鲁丝片| 亚州av综合色区无码一区| 国产午夜影视大全免费观看| 精品人妻无码专区在中文字幕| 原来是神马琪琪在线观看| 啊┅┅快┅┅用力啊岳| 天天做天天摸天天爽天天爱| 久久欧美牲大无无码毛片| 国模冰莲自慰肥美胞极品人体图| 久久久久夜色精品国产明星| 小东西真紧校园h| 御书房双乳晃动干柴烈|